Life Republic
Life Republic is an urban high-end residential project in Hinjewadi, Pune by the well-known realty firm Kolte-Patil. Billed as one of the big-ticket projects in Pune, it boasts of contemporary architecture & modern amenities.
At more than 400 acres, the lush-green township of Life Republic is one of the largest townships across the country. The project being developed by Kolte Patil Developers is located at the centre of Hinjewadi in Pune which is one of the major IT hubs of the state of Maharashtra. In order to provide the residents of the township the sense of safety associated with the place that they call home, Vasu Infosec was called onto the project. The directive issued was not simply to make the place feel safe and secure but to provide the tech-savy population of the area with intelligent homes that they could feel proud to call their own.
The entire 400 acres including the undulating greens have been equipped with fire alarm systems
Isolated from the rush, noise and discomfort of Pune city, the homes were built to be spacious and comfortable warranting the need for a Video to Door phone enabling the occupants to receive their guests warmly. Intrusion Detection systems were put in place to raise an alarm and keep any potential intruders at bay thereby ensuring the safety of valuable possessions of the home owners. The complete township is also under CCTV surveillance which ensures that unidentified individuals are tracked in real-time by the security personnel and intercepted before they cause any major potential security breach. The entire 400 acres including the undulating greens have been equipped with fire alarm systems ensuring that there is no hazard to the residents and their lives. The highlight of the residence lies in the fact that all the homes are fully equipped with Home Automation equipment enabling all residents to operate their appliances from their smartphones using wifi based sensors making them more intelligent than traditional ones. All these technologies deployed by Vasu Infosec make Life Republic the ideal place to call home for the tech enthusiasts of Pune city.