National Border Security
Indo-Pak Border ICP Attari
With the average daily ridership of over 5.5 million, The Delhi Metro is the Capital City’s urban rapid transit system. It is one of the busiest metros in the world offering passengers an escape from the city’s traffic snarl-up.
Indo-Nepal Border ICP Jogbani and Raxaul
The ICPs Jogbani and Raxaul are two towns located about 325 km north-east and 230 km north-west from Patna, the capital city of the state of Bihar respectively lying on the India-Nepal border.
Indo-Bangladesh Border ICP Petrapole
ICP Petrapole is a trade center located between Kolkata (about 80 km) and Benapole, the Bangladesh check-point between India-Bangladesh border. It’s a gateway for import-export trade and employment opportunities
Number greater than the perimeter of over 90% countries in the world, India has more than 15,000 kms of national borders that it shares with its neighbouring countries. To add to this there is barely any love shared in India’s relationship with two of its largest border sharing countries China and Pakistan. Mass illegal immigration from Bangladesh to India has also been a major talking point between the countries over the past few years. These circumstances go on to ensure that securing the national borders from intrusion or invasion is a huge priority for the country.
Vasu Infosec has been the go-to surveillance and safety partner for RITES Ltd., a Government of India Enterprise
Vasu Infosec has been the go-to surveillance and safety partner for RITES Ltd., a Government of India Enterprise established in 1974, under the aegis of Indian Railways responsible for ensuring the security of these borders. Vasu Infosec has installed thousands of CCTV cameras and countless fire prevention systems across 4 major border projects. The Wagah Border at Attari has been secured from fire hazards by installing fire-fighting and fire suppression equipment including a sprinkler system, an external hydrant system custom-made by using ductile iron pipes and a wet riser system. The Indo-Nepal border at Raxaul and Jogbani has been equipped with fire detection, fire suppression and fire fighting equipment in addition to complete CCTV surveillance with a fibre optic network and an emergency PA and voice evacuation system. The Indo-Bangladesh border at Petrapole. West Bengal holds the distinction of having a completely Optical Fibre Cable based CCTV surveillance network which ensures much faster uplinks and zero downtime, apart from fire detection and voice evacuation systems. Thus, the nation can feel a lot more secure because of Vasu Infosec and its precise execution of these highly sensitive border security projects.