VERTICALS
INFRA / GOVERNMENT
Fire Fighting | Fire Alarm | Clean Agent Flooding System
DELHI METRO RAIL, DELHI
35 Stations under DMRC
6 Stations on Airport Express Line
2 Metro Rail Depots
Fire Fighting
RAPID METRO RAIL, GURUGRAM
12 Stations un RMGL
2 Metro Rail Depots
Fire Fighting
INDIAN RAILWAYS, SAHARANPUR
1 Depot under Alstom
1 Training Center
1 Administrative Building
BORDER SECURITY
Fire Fighting
INDO-PAK BORDER ICP ATTARI
Sprinkler Systems in Warehouses
Outdoor & Indoor Hydrant Systems
INDO-NEPAL BORDER ICP JOGBANI & RAXAUL
Fire Detection & Fire Fighting in over 25 Buildings
800+ Speakers with digital controllers
280+ CCTV Cameras
Sprinkler & Hydrant Systems
Fire Fighting
INDO-BANGLADESH BORDER ICP PETRAPOLE
Sprinkler Systems in Warehouses
Outdoor & Indoor Hydrant Systems
CORPORATE / COMMERCIAL
TECH MAHINDRA
Over 3 locations in Pune
Addressable Fire Alarm & PA
INTERNATIONAL CONVENTION CENTER, PUNEINTERNATIONAL CONVENTION CENTER, PUNE
Over 800+ devices
HDFC BANK
350+ Branches over 17 states
CCTV and Panic Alarm System for Branches
Fire Alarm, Fire Fighting, CCTV, PA in back offices
PHARMA / MEDICAL
LUPIN INDIA
12 Sites located in Maharashtra, Goa & Gujarat
SERUM INSTITUTE OF INDIA
24 Panels with central monitoring facility
1,60,000 devices system capability
Integrated PA-VA
Integration with Elevator, AHU, Access Control & LV
RESIDENTIAL
LIFE REPUBLIC, KOLTE PATIL
Individual VDP with door control
Lighting control for every flat
KOOL HOMES, PUNE
VDP & Lighting Automation
Motion detection lighting control for parking
CCTV and Fire Alarm Systems
BMS for every building