Data Centre FAT, SAT & Commissioning

Technical Checklist / Template

Data Centre FAT, SAT & Commissioning

Nov 2026

Introduction

Data Centre systems require proper testing and commissioning to ensure reliability, safety and operational readiness. Factory Acceptance Testing (FAT), Site Acceptance Testing (SAT) and final commissioning help verify that installed equipment and integrated systems meet approved project specifications.

1. Factory Acceptance Testing (FAT)

FAT is conducted at the manufacturer’s or supplier’s facility before equipment is dispatched to site.

Key Checklist:

  • Verify approved technical specifications and drawings.
  • Check equipment model, ratings and accessories.
  • Verify control panel and system functionality.
  • Review alarm indications and communication interfaces.
  • Check approved test reports and documentation.

2. Site Acceptance Testing (SAT)

SAT is performed at the project site after equipment installation.

Key Checklist:

  • Verify equipment installation against approved drawings.
  • Inspect cable termination, wiring and labelling.
  • Check power supply and earthing.
  • Verify device communication and system integration.
  • Test alarms, signals and control functions.
  • Record observations and rectify identified defects.

3. Final Commissioning Checklist

System Key Verification
Fire Alarm System Detector, MCP and alarm testing
Gas Suppression System Cylinder, nozzle and release sequence checks
CCTV System Camera view, recording and monitoring
Access Control Reader, door lock and access permissions
BMS / IBMS Communication and alarm integration

4. Essential Documentation

Maintain approved drawings, FAT and SAT reports, inspection records, test certificates, commissioning reports, defect closure records and final handover documents.

Conclusion

A structured FAT, SAT and commissioning process helps ensure that Data Centre safety and security systems operate as intended. Proper testing, documentation and integrated system verification are essential before final project handover.