Jockey Pump Selection & Operation
Oct 2026
Direct Answer
A jockey pump maintains normal standby pressure in a fire protection system by compensating for minor pressure losses. It is not a substitute for the main fire pump during a fire demand. Its capacity, start/stop settings, pressure sensing, controller and connections should be coordinated with the approved fire protection design and main-pump starting sequence.
1. Engineering Overview
A Jockey Pump is a small-capacity pressure maintenance pump installed within a fire protection pumping arrangement to maintain system pressure during normal standby conditions and compensate for minor pressure losses. It is not intended to replace the main fire pump during a fire demand.
2. System Architecture
Fire Water Storage → Fire Pump Suction → Jockey Pump / Main Fire Pumps → Common Fire Water Header → Sprinkler / Hydrant / Other Fire Protection Network
Pressure Sensing → Jockey Pump Controller → Jockey Pump Start / Stop → System Pressure Maintenance
3. Purpose of Jockey Pump
The primary function of the jockey pump is to maintain the fire protection system at its normal standby pressure. Small pressure losses caused by minor leakage, temperature variation or routine system conditions can be compensated without starting the main fire pump.
4. Major Components
A typical jockey pump arrangement may include:
- Jockey pump
- Electric motor
- Jockey pump controller
- Pressure sensing arrangement
- Suction piping
- Discharge piping
- Isolation valves
- Check valve
- Pressure gauges
- Associated monitoring / alarm signals
5. Jockey Pump Capacity
Jockey pump capacity should be selected to maintain system pressure and compensate for expected minor leakage without creating unnecessary main fire pump operation. The final capacity should follow the approved fire protection design and project requirements.
6. Pressure Setting
Jockey pump start and stop pressure settings should be coordinated with the main fire pump starting pressure and the required normal system pressure. The settings should provide a clear operating sequence between the jockey pump and main fire pumps.
7. Operating Sequence
Normal Pressure → Minor Pressure Loss → Jockey Pump Start → System Pressure Recovery → Jockey Pump Stop
If pressure continues to fall due to a fire demand, the main fire pump should start according to the approved fire pump control sequence.
8. Coordination with Main Fire Pump
The jockey pump should not be sized or pressure-set in a manner that prevents the main fire pump from starting during a genuine fire demand. The complete pressure hierarchy should be verified during commissioning.
9. Pump Selection Parameters
Selection should consider:
- Required standby flow
- Normal system pressure
- Jockey pump duty pressure
- Pump curve
- Motor rating
- Suction conditions
- Discharge pressure
- Controller settings
- System leakage characteristics
10. Pump Performance Curve
The selected jockey pump performance curve should be reviewed to verify that it can maintain the required system pressure at the intended standby flow. The pump should operate reliably within its approved performance range.
11. Motor Selection
The electric motor should be suitable for the selected jockey pump duty and operating environment. Motor rating, electrical supply, starting method and controller compatibility should be verified.
12. Controller Architecture
The jockey pump controller should provide automatic pressure-based starting and stopping as required by the approved system design. Controller indications and fault signals should be available for monitoring where specified.
13. Pressure Sensing
Pressure sensing should be installed at the approved system location so that the jockey pump responds to actual fire protection system pressure. Sensing lines and connections should be protected against leakage, blockage or accidental isolation.
14. Suction Arrangement
The jockey pump suction connection should provide a reliable water supply from the approved source. Suction piping should be appropriately sized and arranged to avoid unnecessary hydraulic losses.
15. Discharge Arrangement
The jockey pump discharge should connect to the fire protection system through the approved check valve and isolation arrangement. The connection should prevent undesirable reverse flow or pressure interaction with the main pumps.
16. Installation Requirements
Installation should verify:
- Correct jockey pump model
- Correct flow and pressure
- Correct motor rating
- Correct controller
- Correct pressure sensing connection
- Correct suction and discharge arrangement
- Correct valve orientation
- Secure mounting
- Adequate access for maintenance
17. Testing & Commissioning
Commissioning should verify:
- Jockey pump automatic start
- Jockey pump automatic stop
- Pressure recovery
- Pressure sensing response
- Controller operation
- Main fire pump start coordination
- Running indication
- Fault indication
- Check valve operation
18. Pressure Hierarchy Verification
The complete pressure sequence should be verified to ensure that the jockey pump responds first to minor pressure loss and that continued pressure reduction results in the required main fire pump operation. Final settings should follow the approved project design.
19. Inspection & Maintenance
Periodic maintenance should include inspection of the pump, motor, controller, pressure sensing arrangement, valves, check valve, gauges and associated piping. Unnecessary cycling, leakage or abnormal pressure behaviour should be investigated.
20. Design Change Control
Changes to system pressure, main pump settings, fire protection demand, piping configuration or pressure sensing location should be reviewed before modifying jockey pump settings or capacity.
21. Documentation
Jockey pump documentation should include, as applicable:
- Pump datasheet
- Pump performance curve
- Motor datasheet
- Controller datasheet
- Pressure setting schedule
- Piping arrangement
- Hydraulic calculation / design basis
- Commissioning records
- Pressure test records
- Maintenance records
- As-built drawings
- O&M manual
22. Engineering Objective
The engineering objective is:
Maintain Normal System Pressure → Compensate Minor Losses → Avoid Unnecessary Main Pump Starts → Coordinate Pressure Settings → Ensure Reliable Main Pump Activation During Fire Demand → Verify Operation → Maintain System Readiness
Frequently Asked Questions
What is the purpose of a jockey pump?
It maintains normal standby pressure and compensates for minor pressure losses so the main fire pump does not start unnecessarily under normal conditions.
Does a jockey pump replace the main fire pump?
No. The source states that it is not intended to replace the main fire pump during a fire demand.
How should jockey pump pressure settings be selected?
Start/stop settings should be coordinated with normal system pressure and the main fire pump starting pressure, following the approved project design.
What should be checked during commissioning?
The source lists automatic start and stop, pressure recovery and sensing response, controller operation, coordination with main-pump starting, running/fault indications and check-valve operation.
What records should be maintained?
As applicable, the source lists pump, motor and controller datasheets, performance curve, pressure-setting schedule, piping arrangement, hydraulic design basis, commissioning and pressure-test records, maintenance records, as-built drawings and the O&M manual.