Clean Agent Fire Suppression in Pune for Architects & PMCs

Clean Agent / Architects, Interiors & PMCs

Intelligent Fire Protection for High-Value Commercial Spaces

Vasu Infosec Limited is a Pune-based fire protection company supporting the design, supply, installation, testing, commissioning and maintenance of clean-agent fire suppression systems for server rooms, control rooms and commercial fit-outs. We assess IG-541 inert gas separately from chemical clean agents such as FK-5-1-12 and HFC-227ea. Architects, PMCs and MEP consultants can coordinate agent selection, cylinder space, pipe routing, room integrity and HVAC interfaces with our team.

For architects, fit-out teams & consultants

Design and specification support

Spaces to assess

Review enclosed server, control and equipment rooms against the building fire strategy.

Fit-out sequencing

Plan surveys, invasive works and shutdowns around occupancy and the fit-out programme.

Existing building safeguards

Confirm which protection systems must remain operational during refurbishment and who coordinates temporary measures.

Vasu project portfolio

HDFC Bank

HDFC Bank appears in Vasu’s banking portfolio. Ask our team for product-specific references relevant to your fit-out or commercial project.

Explore Vasu’s project portfolio

Clean-agent specification package for fit-outs

For architects, fit-out teams and PMCs, start with the enclosure and the occupied-space fire strategy. Confirm the agent and system footprint early enough to coordinate the interior layout.

Drawings to share

Provide floor and ceiling plans, door and penetration details, equipment and occupancy information, and HVAC plans.

Items to coordinate

Reserve cylinder and maintenance space, plan pipe and nozzle routes, define enclosure sealing and pressure relief, and agree HVAC and release interfaces.

Submittals and handover

Agree drawings, equipment schedules, release logic and room-integrity testing with the consultant. For occupied spaces, assess agent suitability, warning, means of egress and ventilation against the project fire strategy and the selected system’s limits.

Technical resources

Clean-agent fire suppression services in Pune

Our Kothrud, Pune office supports architects, PMCs, MEP consultants and facility teams with project surveys, system selection, installation coordination, commissioning and maintenance. Chemical clean-agent options include FK-5-1-12 and FM-200 (HFC-227ea), subject to the approved design and application requirements. IG-541 inert-gas systems are assessed separately.

For a proposal, share the room layout, dimensions, protected equipment, occupancy and existing fire-system information. We can coordinate enclosure sealing, HVAC interfaces and room-integrity testing as part of the agreed scope.

Vasu Infosec Limited
Office No. 13, 4th Floor, Bandal Capital, Paud Road, near Kothrud Bus Depot, Kothrud, Pune – 411038, Maharashtra.

Call Pune office: 020 2528 2462  |  Request a project assessment  |  Find Vasu Infosec on Google Maps

Related fire protection resources