Infrastructure applications
Assess tunnel, metro or industrial hazards and identify the areas where the project fire strategy calls for specialist suppression.
Water Mist / Infrastructure & EPC
Engineered Water-Mist Fire Protection for Critical Infrastructure
Vasu Infosec Limited provides water mist fire suppression engineering for tunnel, metro and industrial infrastructure projects in India. We support EPC teams with hazard assessment, hydraulic design, zoning and detection interfaces. System selection depends on verified performance for the specific application.
For owners, EPCs & engineering consultants
Assess tunnel, metro or industrial hazards and identify the areas where the project fire strategy calls for specialist suppression.
Plan access, installation staging and maintenance isolation for operating infrastructure.
Agree responsibility for power, drainage, civil works and connections to the tunnel or facility control system.
Vasu project portfolio
Vasu’s infrastructure portfolio features this rail corridor, including the T49/T50 and T14 tunnel sections. Ask our team for product-specific references relevant to your scope.
For infrastructure and EPC tenders, establish the design fire scenario and intended application before comparing water mist proposals. Confirm that the evidence covers the proposed hazard and arrangement.
Provide fire-load and design-fire scenario information, protected geometry, tunnel ventilation where relevant, water supply, fire detection interfaces and commissioning requirements.
Review the selected system’s applicable test or listing evidence, hydraulic calculation, nozzle schedule, pump or water-supply duty and zoning.
Agree how to witness flow and pressure, detection and valve operation, interfaces, functional testing and handover.
Technical resources