Protected spaces
Assess enclosed server, electrical and control rooms against the project fire strategy and the risk in each room.
IG-541 Inert Gas / Infrastructure & Data Centres
Engineered Gas Suppression for Mission-Critical Infrastructure
Vasu Infosec Limited engineers IG-541 inert gas fire suppression systems for data centres, metro facilities and other critical enclosed infrastructure in India. The design review covers protected volume, cylinder banks, discharge calculations, room integrity, and fire alarm and HVAC interfaces.
For owners, EPCs & engineering consultants
Assess enclosed server, electrical and control rooms against the project fire strategy and the risk in each room.
Plan equipment movement, access windows and temporary protection with the facility team where the site remains operational.
Agree who provides room sealing, power, controls integration and builder’s work before award.
Vasu project portfolio
Vasu’s portfolio includes this hyperscale data centre campus in Noida. Ask our team for product-specific project references relevant to your tender.
For data centre owners, EPCs and consultants, the design package should connect the enclosure survey, the selected system’s calculations and the tests that will be witnessed at handover.
For data centre, metro, EPC and government tenders, provide protected volumes and voids, enclosure and HVAC interfaces, occupancy, hazards and the BOQ. Identify large-volume rooms and any phased turnover requirements.
Define cylinder-bank and manifold arrangements, pipe and nozzle layouts, OEM calculations, pressure relief, alarm interfaces and the cause-and-effect matrix.
Agree the door-fan test scope, functional interface checks, commissioning records, as-built drawings and operations and maintenance documents.
Technical resources