Water Mist Fire Protection for Architects & PMCs

Water Mist / Architects, Interiors & PMCs

Advanced Fire Protection Designed Around Your Space

Vasu Infosec Limited provides commercial water mist fire protection design support for architects, interior designers and PMCs in India. We coordinate nozzle placement, pipe routing and water demand with ceiling plans and building services. System suitability depends on the hazard and verified design criteria.

For architects, fit-out teams & consultants

Design and specification support

Spaces to assess

Define the intended commercial application and check it against the project fire strategy.

Fit-out sequencing

Coordinate first-fix pipework, ceiling closures and final connections with the contractor’s programme.

Changes after design

Recheck the design when partitions, ceiling geometry, occupancy or fit-out finishes change.

Vasu project portfolio

ABIL Boulevard, Pune

Vasu’s commercial portfolio features ABIL Boulevard in Pune. Ask our team for product-specific references relevant to your fit-out or commercial project.

Explore Vasu’s project portfolio

Water mist specification package for commercial interiors

For architects and interior teams, coordinate nozzle locations, ceiling details and service access before the reflected ceiling plan is final. Verify the proposed system against the project fire strategy.

Drawings to share

Provide floor and reflected ceiling plans, sections, ceiling details, plant-space constraints and available water supply.

Items to coordinate

Check nozzle openings and obstructions, align routes with lighting and HVAC, and reserve access for valves, equipment and maintenance.

Submittals and handover

Agree application evidence, hydraulic calculations, the nozzle and finish schedule, ceiling coordination drawings and commissioning checks with the consultant. Confirm approved nozzle configurations before specifying recessed or concealed details.

Technical resources

Related fire protection resources