Case Study
IBMS Network Architecture and Segmentation Assessment
Nov 2026
Direct Engineering Answer
The illustrative architecture groups 30 connected assets into three logical zones and identifies six controlled inter-zone communication paths. The communication matrix and final VLAN, subnet and firewall rules remain subject to approval by the responsible IT/OT authority.
1. Project Background
This case study presents an illustrative engineering approach for establishing a structured network architecture for an Integrated Building Management System (IBMS). The objective is to separate supervisory, automation and field communication domains while maintaining the approved data flows between servers, gateways, controllers and operator workstations. Final network topology, addressing, firewall policy and cybersecurity controls shall be based on the approved IT/OT architecture, project specifications and equipment requirements.
2. Facility / System Profile
| Parameter | Design Basis | Engineering Relevance |
| Facility | Commercial / critical facility | Requires controlled IBMS connectivity. |
| IBMS Servers | 2 illustrative servers | Supervisory and historian functions. |
| Operator Workstations | 2 illustrative stations | Controlled operator access. |
| Automation Controllers | 20 illustrative controllers | Field/plant control layer. |
| Protocol Gateways | 6 illustrative gateways | Integration with third-party systems. |
| Network Domains | 3 illustrative zones | Segmentation of supervisory, automation and field traffic. |
| Core Network | Redundant managed switching | Supports availability and controlled connectivity. |
3. Engineering Challenge
A flat building-automation network can increase fault propagation, broadcast traffic and exposure of critical controllers. The engineering challenge is to create logical separation without disrupting required BACnet, Modbus or approved gateway communication. The design must also define who owns network addressing, firewall rules and remote access controls.
- Identify IBMS network assets and communication paths.
- Separate supervisory, automation and field domains.
- Define VLAN/subnet architecture where approved.
- Identify required inter-zone communication.
- Minimise unnecessary lateral communication.
- Provide controlled remote-access arrangements.
- Document network addressing and interface ownership.
4. Engineering Basis and Applicable References
The engineering framework for this library identifies the approved IBMS architecture, IT/OT network design, OEM communication requirements, cybersecurity policy, point list and project specifications as the governing basis. Exact VLANs, subnets, firewall rules and security controls are project-specific and shall be approved by the responsible IT/OT authority.
| Reference | Engineering Application |
| Approved IT/OT Architecture | Defines network zones and trust boundaries. |
| IBMS Network Diagram | Defines equipment and communication paths. |
| OEM Protocol Documentation | Defines required communication ports and addressing. |
| Cybersecurity Policy | Defines access, authentication and remote-access controls. |
| Point/Interface List | Defines systems requiring communication. |
| Project Specification | Defines contractual networking requirements. |
5. Existing Conditions / Assessment Basis
- The illustrative architecture contains 30 active network-connected IBMS/ELV assets.
- The assets are grouped into supervisory, automation and field/integration domains.
- An initial flat-network concept is assumed for comparison.
- The proposed architecture separates the assets into three logical zones.
- Six controlled inter-zone communication paths are identified.
- All quantities and topology details are illustrative.
6. Engineering Methodology
- Prepare an asset inventory.
- Identify communication dependencies.
- Classify assets by operational function and trust boundary.
- Develop logical network zones.
- Assign approved IP/subnet strategy.
- Define required inter-zone traffic.
- Establish firewall/ACL requirements with the IT/OT authority.
- Validate protocol communication after segmentation.
- Document the final network architecture and addressing schedule.
7. Illustrative Network Zone Architecture
| Zone | Illustrative Assets | Primary Purpose |
| Zone 1 – Supervisory | 2 servers + 2 workstations | IBMS application, graphics and historian. |
| Zone 2 – Automation | 20 controllers | Building/plant automation control. |
| Zone 3 – Integration/Field | 6 gateways | Third-party protocol integration. |
| Total | 30 assets | Controlled IBMS network base. |
8. Illustrative Network Segmentation Assessment
| Parameter | Initial Concept | Proposed Concept |
| Logical Zones | 1 flat zone | 3 zones |
| Inter-Zone Controls | None/limited | Controlled firewall/ACL policy |
| Controller Exposure | Broad network reachability | Restricted communication paths |
| Gateway Access | Shared network | Dedicated integration zone |
| Remote Access | Project dependent | Controlled, approved access path |
9. Illustrative Communication Path Assessment
Total identified inter-zone communication paths = 6
Assume 2 paths require bidirectional communication and 4 paths require one-way monitoring/data acquisition.
Bidirectional paths = 2
Monitoring/data-acquisition paths = 4
The communication matrix should explicitly define source, destination, protocol, port/service, direction and business/engineering purpose.
10. Engineering Solution
- Adopt a zone-based architecture rather than an unrestricted flat network where the project permits segmentation.
- Place IBMS application servers and operator workstations within the approved supervisory domain.
- Group automation controllers within the automation domain.
- Use a controlled integration zone for third-party gateways where appropriate.
- Permit only documented communication paths between zones.
- Coordinate firewall/ACL implementation with the responsible IT/OT team.
- Maintain an approved IP addressing and asset register.
- Disable unused interfaces/services in accordance with approved cybersecurity policy.
- Test all required communications after implementation.
11. Network Interface Matrix
| Interface | Source | Destination | Purpose | Verification |
| N-01 | IBMS Server | Automation Controllers | Supervisory data | Live communication test. |
| N-02 | IBMS Server | Gateway | Third-party data acquisition | Protocol test. |
| N-03 | Operator WS | IBMS Server | HMI access | User login test. |
| N-04 | Historian | IBMS Server | Historical data | Trend test. |
| N-05 | Approved Gateway | Third-party System | Integration data | End-to-end test. |
| N-06 | IT/OT Management | Approved Network Assets | Authorised management | Access-control test. |
12. Coordination and Execution Challenges
- Segmentation can interrupt undocumented legacy communications.
- Third-party devices may require fixed ports or broadcast/discovery traffic.
- BACnet discovery requirements must be considered before restricting network traffic.
- Remote vendor access requires explicit approval and controlled implementation.
- IP addressing changes can require controller reconfiguration.
- Network changes should be coordinated with FAT/SAT to prevent late-stage integration failures.
13. Testing, Commissioning and Acceptance
- Verify all network assets against the approved register.
- Confirm IP addressing and host identification.
- Test required inter-zone communications.
- Verify prohibited communication paths are blocked where specified.
- Test BACnet/Modbus/gateway communication after segmentation.
- Verify IBMS graphics and point updates.
- Test operator workstation connectivity.
- Verify approved remote-access controls.
- Record network test results and close discrepancies.
- Issue the final network diagram and addressing schedule.
14. Engineering Outcome
| Outcome | Engineering Result |
| Facility | Illustrative commercial / critical facility. |
| Connected Assets | 30. |
| Logical Zones | 3. |
| Controlled Inter-Zone Paths | 6. |
| Primary Deliverable | Approved IBMS network architecture, communication matrix and addressing schedule. |
| Final Acceptance | Requires IT/OT approval, communication testing and final as-built documentation. |
15. Lessons Learned
- Network architecture is a core IBMS engineering deliverable.
- Segmentation should be designed around actual communication dependencies.
- Firewall rules must be based on documented engineering requirements.
- Protocol discovery and broadcast behaviour must be considered before implementing restrictions.
- Network changes should be validated through integrated testing.
- Asset and addressing registers are essential for long-term maintenance.
16. Design Review Checklist
☐ Asset inventory prepared
☐ Network zones defined
☐ IP/subnet strategy approved
☐ Communication matrix prepared
☐ Required ports/services identified
☐ Firewall/ACL ownership defined
☐ Remote access reviewed
☐ BACnet/Modbus dependencies checked
☐ Segmentation testing completed
☐ IBMS communication verified
☐ IT/OT approval obtained
☐ Final network/as-built documentation issued
17. Related Engineering Content
| Content Type | Reference |
| Engineering Calculations | EC-066 to EC-075 – ELV & IBMS; EC-071 – IBMS Network Architecture and Segmentation Assessment |
| Related Case Studies | CS-066 – Point List; CS-067 – BACnet/Modbus; CS-068 – Alarm/Cause-and-Effect; CS-069 – HMI; CS-070 – Historian |
| Related White Paper | IBMS Network Architecture, Segmentation and IT/OT Integration Engineering |
| Related FAQs | IBMS Network; VLAN; Subnet; Firewall; ACL; BACnet Broadcast; Modbus TCP; Remote Access; IT/OT |
| Related Engineering Diagram | ED-071 – IBMS Three-Zone Network Architecture and Controlled Communication Paths |
18. Source Basis and Engineering Qualification
The 30 connected assets, three logical zones and six illustrative communication paths in this case study are engineering assumptions created to demonstrate network-architecture methodology. They are not claimed as project-recorded data, universal segmentation requirements or cybersecurity benchmarks. Final architecture shall be based on approved IT/OT policy, actual equipment, OEM protocol requirements and project specifications.