Access Control Battery Backup Duration Calculation

Engineering Calculation

Access Control Battery Backup Duration Calculation

Nov 2026

At a Glance

Resource ID EC-082
Total Load Current I | 3.64 | A
Required Backup Time T | 4 | Hours
Battery Utilization DoD | 80 | %
Engineering Margin M | 20 | %
Source detail Refer to Technical Content
Source detail Refer to Technical Content
Source detail Refer to Technical Content

Calculation Method & Worked Example

Battery Capacity (Ah) = (Load Current × Backup Time ÷ Battery Utilization) × Engineering Margin

Battery Capacity = (3.64 × 4 ÷ 0.80) × 1.20 = 21.84 Ah

Recommended Minimum Battery Capacity: 21.84 Ah (select next higher standard size).

Applicable Standards Listed in the Source

UL 294 Access Control System Units
NFPA 70 National Electrical Code
IEC 60364 Electrical Installations
Manufacturer Guidelines Battery sizing recommendations

Technical Content

1. Purpose

To estimate the battery backup duration required for an access control system during mains power failure.

2. Engineering Objective

To determine the minimum battery capacity required to maintain uninterrupted operation of controllers, readers, locks and accessories for the specified backup period.

3. Applicable Standards

Standards and descriptions are reproduced from the source document.

4. Design Inputs

Total Load Current | I | 3.64 | A
Required Backup Time | T | 4 | Hours
Battery Utilization | DoD | 80 | %
Engineering Margin | M | 20 | %

5. Assumptions

Battery utilization is limited to 80% and a 20% engineering reserve is included.

6. Formula(s)

Battery Capacity (Ah) = (Load Current × Backup Time ÷ Battery Utilization) × Engineering Margin

Battery Capacity (Ah) = (Load Current × Backup Time ÷ Battery Utilization) × Engineering Margin

Recommended Minimum Battery Capacity: 21.84 Ah (select next higher standard size).

7. Variables Explained

I = Load current; T = Backup time; DoD = Battery utilization; M = Engineering margin.

8. Step-by-Step Calculation

Battery Capacity = (3.64 × 4 ÷ 0.80) × 1.20 = 21.84 Ah

Battery Capacity = (3.64 × 4 ÷ 0.80) × 1.20 = 21.84 Ah

Recommended Minimum Battery Capacity: 21.84 Ah (select next higher standard size).

9. Worked Engineering Example

An access control system drawing 3.64 A for 4 hours requires approximately 21.84 Ah of battery capacity.

10. Engineering Output

Recommended Minimum Battery Capacity: 21.84 Ah (select next higher standard size).

Recommended Minimum Battery Capacity: 21.84 Ah (select next higher standard size).

Recommended Minimum Battery Capacity: 21.84 Ah (select next higher standard size).

Recommended Minimum Battery Capacity: 21.84 Ah (select next higher standard size).

11. Design Considerations

Consider battery ageing, ambient temperature, charger capacity, lock inrush current and future expansion.

12. Common Design Mistakes

Ignoring battery derating, omitting reserve capacity and undersizing batteries.

13. Practical Site Notes

Perform periodic battery testing and replace batteries according to OEM recommendations.

14. Limitations

Preliminary engineering calculation only. Final battery sizing shall be verified using manufacturer discharge curves.

15. Related Engineering Systems

Access Controllers, Power Supplies, UPS, Magnetic Locks, Emergency Power.

16. Keywords (15)

Access Control,Battery Backup,Battery Capacity,UL294,Security System,Engineering Calculation,Power Supply,UPS,Magnetic Lock,Door Controller,Standby Power,ELV,Battery Sizing,Backup Time,DC Power

17. AI Search Summary

Battery capacity is calculated from total load current, required backup duration, allowable battery utilization and engineering reserve. The example recommends approximately 21.84 Ah.

Frequently Asked Questions

What is the purpose of EC-082?

To estimate the battery backup duration required for an access control system during mains power failure.

What result does the source example report?

An access control system drawing 3.64 A for 4 hours requires approximately 21.84 Ah of battery capacity.

Can this preliminary calculation be used as final design approval?

Preliminary engineering calculation only. Final battery sizing shall be verified using manufacturer discharge curves.

What should be checked before final selection or implementation?

Consider battery ageing, ambient temperature, charger capacity, lock inrush current and future expansion.