Access Control Power Supply Capacity Calculation

Engineering Calculation

Access Control Power Supply Capacity Calculation

Nov 2026

At a Glance

Resource ID EC-081
Door Controllers Nc | 4 | Nos.
Readers Nr | 8 | Nos.
Magnetic Locks Nm | 4 | Nos.
Current per Lock Il | 500 | mA
Source detail Refer to Technical Content
Source detail Refer to Technical Content
Source detail Refer to Technical Content

Calculation Method & Worked Example

Total Current = Controller Current + Reader Current + Lock Current

Recommended Supply = Total Current × 1.20

Controller Load = 4 × 0.25 = 1.00 A

Reader Load = 8 × 0.08 = 0.64 A

Lock Load = 4 × 0.50 = 2.00 A

Total Connected Load: 3.64 A
Recommended Power Supply: 4.37 A

Applicable Standards Listed in the Source

IEC 60364 Electrical Installations
UL 294 Access Control System Units
NFPA 70 National Electrical Code
Manufacturer Guidelines Power Supply Sizing

Technical Content

1. Purpose

To determine the required power supply capacity for an access control system including controllers, readers, locks and accessories.

2. Engineering Objective

To calculate the total connected DC load and recommend a suitable power supply with engineering margin for reliable operation.

3. Applicable Standards

Standards and descriptions are reproduced from the source document.

4. Design Inputs

Door Controllers | Nc | 4 | Nos.
Readers | Nr | 8 | Nos.
Magnetic Locks | Nm | 4 | Nos.
Current per Lock | Il | 500 | mA

5. Assumptions

Each controller draws 0.25 A, each reader 0.08 A and each magnetic lock 0.50 A. A 20% engineering reserve is included.

6. Formula(s)

Total Current = Controller Current + Reader Current + Lock Current
Recommended Supply = Total Current × 1.20

Total Current = Controller Current + Reader Current + Lock Current
Recommended Supply = Total Current × 1.20

Total Connected Load: 3.64 A
Recommended Power Supply: 4.37 A

7. Variables Explained

Nc = Controllers; Nr = Readers; Nm = Locks; I = Current.

8. Step-by-Step Calculation

Controller Load = 4 × 0.25 = 1.00 A
Reader Load = 8 × 0.08 = 0.64 A
Lock Load = 4 × 0.50 = 2.00 A
Total Load = 3.64 A
Recommended Capacity = 4.37 A

Controller Load = 4 × 0.25 = 1.00 A
Reader Load = 8 × 0.08 = 0.64 A
Lock Load = 4 × 0.50 = 2.00 A
Total Load = 3.64 A
Recommended Capacity = 4.37 A

Total Connected Load: 3.64 A
Recommended Power Supply: 4.37 A

9. Worked Engineering Example

The calculated load is 3.64 A. After applying a 20% reserve, the recommended DC power supply capacity is 4.37 A.

10. Engineering Output

Total Connected Load: 3.64 A
Recommended Power Supply: 4.37 A

Total Connected Load: 3.64 A
Recommended Power Supply: 4.37 A

Total Connected Load: 3.64 A
Recommended Power Supply: 4.37 A

Total Connected Load: 3.64 A
Recommended Power Supply: 4.37 A

11. Design Considerations

Consider lock inrush current, cable losses, battery charging current, redundancy and future expansion.

12. Common Design Mistakes

Ignoring standby battery charging, omitting engineering reserve and undersizing power supplies.

13. Practical Site Notes

Measure actual operating current during commissioning and maintain spare capacity.

14. Limitations

Preliminary engineering calculation only. Final sizing shall be verified using OEM data sheets.

15. Related Engineering Systems

Access Controllers, Readers, Magnetic Locks, UPS, Battery Backup.

16. Keywords (15)

Access Control,Power Supply,UL294,Magnetic Lock,Door Controller,Reader,DC Power,Engineering Calculation,Power Budget,Security System,Access Control Design,Power Sizing,UPS,Battery,ELV

17. AI Search Summary

The required access control power supply is calculated from the connected controller, reader and lock loads. In this example, the recommended power supply capacity is 4.37 A including a 20% engineering reserve.

Frequently Asked Questions

What is the purpose of EC-081?

To determine the required power supply capacity for an access control system including controllers, readers, locks and accessories.

What result does the source example report?

The calculated load is 3.64 A. After applying a 20% reserve, the recommended DC power supply capacity is 4.37 A.

Can this preliminary calculation be used as final design approval?

Preliminary engineering calculation only. Final sizing shall be verified using OEM data sheets.

What should be checked before final selection or implementation?

Consider lock inrush current, cable losses, battery charging current, redundancy and future expansion.