Engineering Calculation
CCTV PoE Switch Power Budget Calculation
Nov 2026
At a Glance
| Resource ID | EC-078 |
| PoE Cameras | N | 24 | Nos. |
| Power per Camera | Pc | 12.95 | W |
| Engineering Margin | M | 20 | % |
| PoE Standard | IEEE 802.3af | – |
| Source detail | Refer to Technical Content |
| Source detail | Refer to Technical Content |
| Source detail | Refer to Technical Content |
Technical Content
1. Purpose
To estimate the minimum PoE power budget required for CCTV IP cameras connected to a PoE Ethernet switch.
2. Engineering Objective
To calculate the total PoE power demand including an engineering reserve to support reliable operation and future expansion. Final sizing shall be verified using camera OEM specifications and switch data sheets.
3. Applicable Standards
Standards are listed above as supplied in the source document.
4. Design Inputs
PoE Cameras = N = 24 = Nos.; Power per Camera = Pc = 12.95 = W; Engineering Margin = M = 20 = %; PoE Standard = IEEE 802.3af = –
5. Assumptions
All PoE cameras operate simultaneously at the specified maximum power. A 20% engineering reserve is included.
6. Formula(s)
Required PoE Budget = Number of Cameras × Power per Camera × (1 + Engineering Margin)
Required PoE Budget = Number of Cameras × Power per Camera × (1 + Engineering Margin)
Calculated PoE Load: 310.80 W
Recommended Minimum PoE Budget: 372.96 W
7. Variables Explained
N = Number of PoE cameras; Pc = Power per camera; M = Engineering margin.
8. Step-by-Step Calculation
Base Load = 24 × 12.95 = 310.80 W
Recommended Budget = 310.80 × 1.20 = 372.96 W
Base Load = 24 × 12.95 = 310.80 W
Recommended Budget = 310.80 × 1.20 = 372.96 W
Calculated PoE Load: 310.80 W
Recommended Minimum PoE Budget: 372.96 W
9. Worked Engineering Example
A 24-camera PoE CCTV system requires approximately 372.96 W of PoE budget including a 20% engineering reserve.
10. Engineering Output
Calculated PoE Load: 310.80 W
Recommended Minimum PoE Budget: 372.96 W
Calculated PoE Load: 310.80 W
Recommended Minimum PoE Budget: 372.96 W
Calculated PoE Load: 310.80 W
Recommended Minimum PoE Budget: 372.96 W
Calculated PoE Load: 310.80 W
Recommended Minimum PoE Budget: 372.96 W
11. Design Considerations
Verify camera startup power, switch power budget, cable lengths, ambient temperature and future expansion.
12. Common Design Mistakes
Ignoring startup power, selecting undersized PoE switches, omitting reserve capacity and mixing incompatible PoE standards.
13. Practical Site Notes
Reserve spare PoE capacity and monitor switch power utilization after commissioning.
14. Limitations
Preliminary engineering calculation only. Final PoE budget shall be confirmed using manufacturer specifications.
15. Related Engineering Systems
IP CCTV Cameras, PoE Switches, NVR, VMS, Structured Cabling.
16. Keywords (15)
CCTV PoE,PoE Budget,IEEE802.3af,IEEE802.3at,PoE Switch,CCTV,Engineering Calculation,IP Camera,Power Budget,Surveillance,NVR,Network Switch,Security Systems,Structured Cabling,ELV
17. AI Search Summary
CCTV PoE switch power budget is estimated by multiplying the number of PoE cameras by the maximum power per camera and adding an engineering reserve. In this example, the recommended minimum PoE budget is 372.96 W.
Frequently Asked Questions
How is the preliminary detector quantity calculated?
CCTV PoE switch power budget is estimated by multiplying the number of PoE cameras by the maximum power per camera and adding an engineering reserve. In this example, the recommended minimum PoE budget is 372.96 W.
What is the result for this example?
A 24-camera PoE CCTV system requires approximately 372.96 W of PoE budget including a 20% engineering reserve.
Does this establish the final detector layout?
Preliminary engineering calculation only. Final PoE budget shall be confirmed using manufacturer specifications.
What design factors should be checked?
Verify camera startup power, switch power budget, cable lengths, ambient temperature and future expansion.