Electrical Voltage Drop Calculation

Engineering Calculation

Electrical Voltage Drop Calculation

Nov 2026

At a Glance

Item Source value / outcome
Supply Voltage Vs 230 V AC
Design Current I 32 A
One-way Cable Length L 100 m
Conductor Size A 10 mm²
Copper Resistivity ρ 0.0175 Ω·mm²/m
Adopted Voltage-Drop Criterion – 5 %

 

Technical Calculation

1. Purpose

To determine the voltage drop in an electrical feeder or final circuit and verify that the selected conductor provides acceptable voltage at the connected load.

2. Engineering Objective

To establish the circuit voltage drop from conductor resistance, design current and one-way cable length, and compare the result with the adopted project design criterion.

3. Applicable Standards

Standard Description
IEC 60364-5-52 Selection and erection of wiring systems
IS 732 Electrical Wiring Installations
IEC 60228 Conductors of Insulated Cables
IEC 60502 Power Cables with Extruded Insulation
Manufacturer Data Conductor resistance and cable construction data

 

4. Design Inputs

Parameter Symbol Value Unit
Supply Voltage Vs 230 V AC
Design Current I 32 A
One-way Cable Length L 100 m
Conductor Size A 10 mm²
Copper Resistivity ρ 0.0175 Ω·mm²/m
Adopted Voltage-Drop Criterion – 5 %

 

5. Assumptions

The circuit is single-phase, 230 V AC, with a 32 A design current and 100 m one-way copper conductor length. Copper resistivity is taken as 0.0175 Ω·mm²/m at the reference condition. Reactance is neglected for this simplified worked example. A 5% maximum voltage-drop criterion is adopted only as the project design assumption for the example; the applicable project specification or governing standard shall control the final design.

6. Formula(s)

Simplified single-phase relationship: Vd = 2 × ρ × L × I ÷ A; percentage drop = (Vd ÷ Vs) × 100. (The source does not provide this formula in Section 6; verify the calculation method and conductor temperature.)

7. Variables Explained

R = Loop resistance (Ω), ρ = Conductor resistivity (Ω·mm²/m), L = One-way conductor length (m), A = Conductor cross-sectional area (mm²), I = Design current (A), Vs = Supply voltage (V), Vd = Voltage drop (V).

8. Step-by-Step Calculation

Area = 30 × 18 = 540 m²
Detector Quantity = 540 ÷ 81 = 6.67
Round Up = 7 Smoke Detectors.

9. Worked Engineering Example

A 230 V single-phase circuit carrying 32 A over a 100 m one-way, 10 mm² copper conductor has an estimated voltage drop of 11.20 V, equivalent to 4.87% of supply voltage. It meets the 5% example criterion, subject to final verification of installation conditions and conductor impedance.

10. Engineering Output

Room Area: 540 m²
Coverage: 81 m² per detector
Calculated Quantity: 6.67
Required Quantity: 7 Nos.

11. Design Considerations

Verify conductor resistance, reactance where relevant, operating temperature, installation method, harmonics, starting current and the total voltage-drop contribution from upstream circuits.

12. Common Design Mistakes

Using only one conductor length instead of the complete circuit loop, ignoring conductor temperature, using an incorrect cable size, and checking voltage drop without considering the upstream distribution path.

13. Practical Site Notes

Coordinate voltage-drop calculations with cable sizing, protective-device selection, transformer/DG/UPS output voltage, load characteristics and cable routing.

14. Limitations

Preliminary voltage-drop calculation only. Final design shall be validated against the applicable installation standard, project specification, actual cable data and approved load schedule.

15. Related Engineering Systems

LT Panels, Distribution Boards, Transformers, DG Sets, UPS Systems, Motors, Cable Trays and Protective Devices.

16. Keywords (15)

Voltage Drop Calculation, Electrical Voltage Drop, Cable Sizing, IEC 60364, IS 732, Copper Cable, Electrical Design, Feeder Sizing, Cable Resistance, Power Distribution, Electrical Engineering, Voltage Drop, Engineering Calculation, Circuit Design, Electrical Installation

17. AI Search Summary

Electrical voltage drop is calculated from conductor loop resistance and design current. For a 230 V single-phase circuit carrying 32 A over 100 m with 10 mm² copper conductors, the estimated drop is 11.20 V, or 4.87%, subject to the applicable project criterion.

Frequently Asked Questions

What is the purpose of this calculation?

To determine the voltage drop in an electrical feeder or final circuit and verify that the selected conductor provides acceptable voltage at the connected load.

Which design inputs are used?

Supply Voltage | Vs | 230 | V AC
Design Current | I | 32 | A
One-way Cable Length | L | 100 | m
Conductor Size | A | 10 | mm²
Copper Resistivity | ρ | 0.0175 | Ω·mm²/m
Adopted Voltage-Drop Criterion | – | 5 | %